How to Plan a Replacement, Including What Happens to the Old Unit
Replacement quotes concentrate on the new system. The old one gets a line at the bottom, if it's mentioned at all, and that's where the surprises live.
Removing an air
conditioner properly is regulated work with real steps attached. Knowing what
those steps are tells you whether a quote is complete and whether the person
doing it is the right person.
Decide whether you're replacing like for like
The cheapest
replacement is a new unit of the same capacity in the same position using the
same pipework. That's often the right answer and sometimes it isn't.
Ask whether the
original system was correctly sized, since replacing an undersized unit with
another undersized unit just resets the clock on the same complaint. Ask
whether the position still suits the room, because layouts change. If the house
has been extended, insulated or reglazed since the original install, the load
has changed too.
Have the room
reassessed rather than matching the sticker on the old machine.
Check how the
room is used now as well. A spare bedroom that's become a home office has a
different load and a different schedule from the one the original system was
chosen for.
Find out whether the existing pipework can be reused
Reusing
refrigerant pipework saves money and it isn't always appropriate.
Older pipe
sized for a different refrigerant, pipe that's been in place a long time, or
pipe with signs of corrosion may need replacing. Some manufacturers have
requirements about flushing or replacing lines when changing refrigerant type,
and ignoring that can affect the warranty on the new equipment.
Ask directly
whether the quote includes new pipework or reuses the existing run, and what
the installer's view is on whether it should be reused.
Know who can legally remove the old refrigerant
This is the
part homeowners rarely think about, and it's not optional.
The refrigerant
in the old system has to be recovered rather than released. The Australian Refrigeration Council issues different
types of Refrigerant Handling Licence depending on the work being carried out,
and recovery from existing equipment is licensed work.
If someone
offers to pull the old unit off the wall cheaply, that's the question to ask. A
scrap metal collector is not licensed to recover refrigerant.
Ask what actually happens to the old unit
Once the
refrigerant is recovered, the hardware is metal and electronics.
Most reputable
installers remove the old equipment as part of the job and dispose of it
appropriately. Some charge for it, some include it, and a few leave it in your
yard. Clarify which, because an outdoor unit sitting beside the house for three
weeks is a surprisingly common outcome.
If you're
disposing of it yourself, check what your council accepts and whether it goes
to e-waste or scrap metal.
Don't leave it
on the kerb on the assumption someone will take it. An outdoor unit that still
holds refrigerant isn't general hard waste, and the gas has to come out before
the metal goes anywhere.
Budget for the things that only appear once it's off the wall
A replacement
often exposes what was behind the old unit.
Damaged render
or brickwork around the core hole. A wall plate hiding a larger hole than the
new unit covers. Perished sealant. A bracket that's rusted into the wall.
Electrical work that was acceptable years ago and isn't now.
A good
installer flags the likely ones at quote stage. Ask what happens if they find
something, and whether making good is included.
Check the electrical side hasn't moved on
A new system
may draw differently from the old one, and standards change over time.
The existing
circuit may be adequate or it may need upgrading, and if the switchboard is
older this is the moment that gets discovered. Ask whether an electrician is
included in the quote and whether an electrical certificate will be issued.
Think about timing
Replacing a
system in February means living without cooling during the worst of it, often
at the busiest time for contractors.
Winter and
early spring are easier on every count. Better availability, more time to order
the right equipment, and no pressure to accept the first thing available.
Get the handover you didn't get last time
Most people
inherit a system with no paperwork. A replacement is your chance to fix that.
Ask for the
manual, the warranty documents, the electrical certificate, the licence details
and a note of the model and serial numbers before the air conditioning experts in Brisbane doing the work leave
the site. Put it all in one folder while you're thinking about it, because in
three years you won't remember any of it.
Frequently asked questions
Can I reuse the existing pipework for a new system?
Sometimes, depending on its age,
size, condition and the refrigerant involved. Ask the installer to assess it
rather than assuming either way.
Who removes the old air conditioner?
Usually the installer as part of the job, though
whether it's included or charged varies. Refrigerant recovery is licensed work
regardless of who does it.
What happens to the refrigerant in the old unit?
It must be recovered by someone
appropriately licensed rather than released. Ask how this is handled if the
quote doesn't mention it.
Will the new unit cover the old wall marks?
Not always. Different models have different
footprints, and making good around the old position may be extra. Raise it
before work starts.
When is the best time to replace?
Winter or early spring. Availability is better,
there's time to get the right equipment, and you're not without cooling in the
heat.